Author Topic: ladders, planks , or scaffolds  (Read 7978 times)

Offline brp

  • Newbie
  • *
  • Posts: 1
  • I'm a llama!
ladders, planks , or scaffolds
« on: October 19, 2005, 06:07:20 PM »
Hi, I am a new member here and also a newer contractor. I am doing a job that involves painting a ceiling on a third floor. My challenge is that the ceiling is below a staircase, and right below is nothing for 3 stories down. I need some type of system that involves using uneven legs (one side on the stairs, and one on the floor) , since the stairs are in the way. I also need something to go across the room to the other side, such as a plank, that will attach to another lift device. I don't know if there is a safe way to do this, since my work will involve a platform where there is nothing below. Any suggestions, and also, any safety gear to recommend? There is at least 10 feet or so between each side.

 

the PAINTSMITH

  • Guest
Re:ladders, planks , or scaffolds
« Reply #1 on: October 21, 2005, 10:56:22 AM »
Hmm...Well, without a diagram or photo to help me visualize the situation a little more clearly, all I can come up with (barring getting an articulating manlift into the house), would be to set up with ladderjacks and a pick. Werner and a couple other companies make those neat adjustable convertable ladders, "Little Giant" is one of them. I have the Werner model, and it's been a godsend on staircases.

You could also rent some sectional rolling scaffolding. I've done 40 ft. church ceilings with those (there are outriggers to stabilize them if you're using more than a couple of sections).

This doesn't sound like a fun project--I hope that you bid accordingly... :o

Offline admin

  • Administrator
  • Full Member
  • *
  • Posts: 176
  • Flying this Spruce Goose
    • painterforum
Re:ladders, planks , or scaffolds
« Reply #2 on: October 21, 2005, 09:11:54 PM »
There is always a temptation to "rig" some staging with a challenging job. NEVER sacrifice safety.
A rolling scaffold could be a solution. You will need out rigs for the casters if the staging is going over 12 feet. Three "bucks" of 6 ft. 4 in. sections will top out at 20 feet, add a guard rail, safety belt & lanyard. Platform the entire working stage with walk boards or sheeting.
Follow all OSHA safety regulations while constructing and working from the scaffold.
Good Luck and be Careful.

Admin    pro painter
I am a webmaster in the tradition of Howard Hughes, I fly this Spruce Goose of a website through cyberspace by the seat of my pants and I usually manage to keep her just above the water, but every now and then I get a wet ass. Let me know if you feel a shudder.

 

anything